Within the framework of the project, work is underway to provide citizens of the Mingbulak district with drinking water

Within the framework of the Rural Infrastructure Development project, in the Kyrkchek and Momokhon MCAs, Mingbulak district, Namangan region, in the course of the community mobilization work carried out by the experts of the CEED support partner (Bulgaria) and the Rhythm Plyus company (Uzbekistan), On the part of the residents, the priority subprojects “Improvement of drinking water supply” were selected. Starting 4 July 2022, Namangan Sanoat Loyiha PE design organization have started topographic and geodetic surveys. In total, within the framework of both projects, it is planned to build 23.9 km of the network and 2 water wells. As a result, both mahallas (1067 households and 5509 residents) will be fully provided with clean drinking water. In accordance with the principles of the Project, this process is monitored by the community; and representatives of the Makhalla Development Unit oversee the work.

Within the framework of the project, work is underway to provide citizens of the Mingbulak district with drinking water
Scroll to top